Highway Connecting
Port Kaveh to Bandar Abbas
Execution and construction of approximately 92
Km 4 lane highway (2 lane each side) including
fill and cut, Culvert and Bridges, up
ground-ground and over ground interchanges, ramp
and loop for connecting to existing road, rural,
industrial and business area, asphalt pavement ,
lighting, signing, marking, ruling, guardrail,
infrastructures, safety equipments and of any
other activities necessary for safe and standard
highway. Tolling system at every entry / exit on
the mainland and one Tolling station before the
Persian Gulf Bridge
on the mainland.
The main parameters according to concept studies
are as follows (per direction):
1. Width of roadway = 7.30 meters (2*3.65,
consist of 2 lanes)
2. Emergency stop-band (shoulder asphalt) with a
width of 3 meters
3. Right sub base shoulder (1 meter), left
asphalt shoulder (1 meter)
4. Total width of highway 12.3 meters.
Provision for future widening from 2 to 3 lane
should be provided
|