Highway Connecting Port Kaveh to Bandar Abbas

Execution and construction of approximately 92 Km 4 lane highway (2 lane each side) including fill and cut, Culvert and Bridges, up ground-ground and over ground interchanges, ramp and loop for connecting to existing road, rural, industrial and business area, asphalt pavement , lighting, signing, marking, ruling, guardrail, infrastructures, safety equipments and of any other activities necessary for safe and standard highway. Tolling system at every entry / exit on the mainland and one Tolling station before the Persian Gulf Bridge  on the mainland.

The main parameters according to concept studies are as follows (per direction):

1. Width of roadway = 7.30 meters (2*3.65, consist of 2 lanes)

2. Emergency stop-band (shoulder asphalt) with a width of 3 meters

3. Right sub base shoulder (1 meter), left asphalt shoulder (1 meter)

4. Total width of highway 12.3 meters.

Provision for future widening from 2 to 3 lane should be provided


 
 

 

 